Debug & Download The Example Project - ICP DAS USA ISaGRAF PAC Series Getting Started

Table of Contents

Advertisement

4.3 Debug & Download the Example Project
The last step required to run the LD example program on the μPAC-5x07 PAC systems is
to download the project to the controller (frequently referred to as the "Target"
platform). Before this download can be accomplished you must first establish
communications between your development PC and μPAC-5x07 controller.
First, click the "Link Setup" button in the "ISaGRAF Programs" window.
1. Set the "Target Slave Number" (NET-ID of the controller) as "1". (Default = 1)
If you connected multiple controllers in the same RS-485 network, you must change
the NET-ID to be unique. To change the NET-ID, please refer to
2. The "Communication Port" field means the COM Port on your PC, please select COM1
or COM2.
Important Notice:
If there is no COM Port number to select, you can view and modify the current COM
Port number in "Device Manager" on your computer. (Such as Notebook)
3. Click "Setup" to set the parameters of COM Port.
The communication parameters between target PAC and the PC must be the same.
Getting Started: PAC-5007/5107/5207/5307 Ver. 1.1, 12/2011
PC's COM1
section 3.5
1.
2.
μPAC-5x07's COM1: (Default)
Baudrate:
Parity:
Format:
Flow control:
ICP DAS
.
3.
19200
none
8 bits, 1 stop
none
4-20

Advertisement

Table of Contents
loading

Table of Contents