Appliance Preparation; Vent Collar Preparation - Heat&Glo 6KX-CU Installation Manual

Table of Contents

Advertisement

6 6

Appliance Preparation

A. Vent Collar Preparation
CAUTION! Risk of Cuts, Abrasions or Flying Debris.
Wear protective gloves and safety glasses during instal-
lation. Sheet metal edges are sharp.
NOTICE: Once appliance is set up for top or rear venting,
it CANNOT be changed at a later time.
Top Vent
REMOVE
SCREWS
Figure 6.1 Remove Elbow Heat Shield by Removing
Two Screws
TIN SNIPS
Figure 6.2 Cut Seal Cap Strap Using a Tin Snips and
Bend the Pieces to 90 Degrees
GASKET MATERIAL
Figure 6.3 Remove the White Gasket Material
Covering the Seal Cap
Heat & Glo • 6KX, 6KX-LP, 8KX, 8KX-LP Installation Manual • 2583-980 • Rev. C • 5/23
48
Figure 6.4 Remove Seal Cap
NOTICE: Once the seal cap has been removed it CANNOT
be reattached.
INSULATION
BASKET
INNER VENT
INSULATION
Figure 6.5 Remove Insulation Basket, Inner Vent
Insulation and Outer Vent Insulation
VENT GASKET
Figure 6.6 (Generic Fireplace Shown) To attach the first
section of vent pipe, make sure to use the vent gasket in
the manual bag to seal between the first vent component
and the outer fireplace wrap. Seal with four screws or
caulk with a minimum of 300 ºF continuous exposure rating
may be used to hold the part in place.
Secure the first section of venting to the fireplace by screw-
ing through the two straps left over from cutting the seal
cap strap (Figure 6.6).
It is acceptable to use screws no longer than 1/2 in. (13
mm) to hold outer pipe sections together. If predrilling
holes, DO NOT penetrate inner pipe.
SEAL CAP
OUTER VENT
INSULATION

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents