Packing List; Production Installation - Xinje XSA330-W User Manual

Iot industrial controller
Table of Contents

Advertisement

To prevent static electricity from damaging the industrial controller, touch the effective
grounding metal before touching the controller circuit objects to release static charges
carried by the body, and wear anti-static gloves.
Note

3.4 Packing list

When unpacking the packing box, please check whether the accessories are obviously damaged and
confirm whether the accompanying accessories are consistent. See Table 3 - 1 for specific accessories.
XSA330-W seriesIoT Industrial
1
controller
Rail mounting kit (including screws)
2
Supporting terminal
3

3.5 Production installation

1. Installation method
The XSA330-W seriesIoT industrial controller is installed with the matching guide rail.
Please use the rail R99- 15 DIN to install.
First, install the black rail buckle on the bottom of the controller with two screws, then fix the end
with spring on the top of the DIN rail, and then gently push against the side of the spring to fix the
entire buckle on the rail. To remove, gently push one end of the spring to remove the product.
2. Installation environment
Please install the product under the environmental conditions specified in Section 2.1.1.
Packing accessories
1 piece
1 set
1 set

Advertisement

Table of Contents
loading

Table of Contents