Start Up

Powering Up the Unit

Switching On
To switch the unit on:
1. Switch on the power at the mains supply isolator feeding the unit.
2. Following switch-on, the fan motors will start and the Control Unit will display a series of start-up screens,
described below (see Start-up Screens on page 24).
N.B. If you are intending to carry out work or maintenance inside the unit, switch off the power at the
mains outlet supplying the unit before you remove the covers.
Switching Off
To switch the unit off:
1. Turn the power off at the mains supply isolator.

Control Unit Display

The Control Unit is located at the front of the Sentinel Kinetic unit. The Control Unit provides the user interface
for commissioning and monitoring purposes.
Display
The main display is a 16 character by 2-line liquid crystal
display (LCD) with automatic backlight, which is turned
off to automatically minimise power consumption.
Buttons
Four buttons on the Control Unit provide the controls for configuring and monitoring the unit.
Button
Sentinel Kinetic MVHR Installation & Commissioning
Function
Press to adjust settings and press to save settings.
Press to go to the previous screen or to increase a parameter value. Press
and hold for more than 2 seconds for fast scrolling.
Press to go to the next screen or to decrease a parameter value. Press and
hold for more than 2 seconds for fast scrolling.
Press to activate Boost mode. See page 25 for options.
Press and hold for 5 seconds to activate Purge mode. (Press and hold for 5
seconds to cancel Purge).