Unit Maintenance
!
WARNING
Risk of electric shock, may cause injury and death.
Risk of serious injury. Fan may start up and cause injury.
Disconnect all power sources before inspecting the fan.
FILTER DRIER
Any particles from the condenser piping, compressor or various
components are swept by the refrigerant into the liquid line and
trapped by the filter drier.
It is recommended that the filter drier be replaced each time a
refrigerant line repair is performed.
EXPANSION VALVE
The function of the expansion valve is to maintain adequate
supply of refrigerant to the evaporator. This is in order to satisfy
the charge conditions.
Cleaning
of
the
hydronic
circuit filter, if present.
Visual inspection of all water
pipes for leaks.
Replacing the water in the
hydronic circuit.
Re-tighten electrical panel connectors
and terminals, control parts, power
and junction boxes (quarterly)
Physical inspection of all electrical
panel connectors and relays (monthly)
Check amperage of all electric
motors, compare them according
to the nameplate for anomalies
(quarterly)
Physically check for false
contacts (Twice a month)
Cleaning of the electrical
panel (monthly)
www.clima-flex.com
!
HYDRAULIC MAINTENANCE
Jan
Feb
Mar
Plan
x
x
x
Real
Plan
x
x
x
Real
Plan
x
x
x
Real
ELECTRICAL MAINTENANCE
Jan
Feb
Mar
Plan
x
Real
Plan
x
x
x
Real
Plan
x
Real
Plan
x
x
x
Real
Plan
x
x
x
Real
51
Before adjusting the superheat, verify that the unit charge is
correct and that the liquid line is completely full and free of bubbles,
and that the circuit is operating under stable load conditions The
superheat suction for the evaporator suction discharge is factory
set for 10°F.
!
WARNING
Risk of explosive discharge of refrigerant at high pressure.
This can cause personal injury or equipment damage. Nev-
er loosen refrigerant or electrical line connections until the
compressor has been depressurized on both sides.
ANNUAL MAINTENANCE SCHEDULE
Before performing any work on the unit, make sure you have
the proper Personal Safety Equipment (EPS), and that the unit
is turned off and idle. It is also recommended that the unit be
turned on 24 hours prior to first start-up to begin warming up the
compressor crankcase.
Apr
May
Jun
Jul
Aug
x
x
x
x
x
x
x
x
x
x
x
x
Apr
May
Jun
Jul
Aug
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
!
Sep
Oct
Nov
Dec
x
x
x
x
x
x
x
x
x
x
x
x
Sep
Oct
Nov
Dec
x
x
x
x
x
x
x
x
x
x
x
x
x
x
iom-clicsa-cf-eng
x
x
x
x
x
x

Advertisement

Table of Contents
loading

Table of Contents