Enelion LUMINA User Manual

Enelion LUMINA User Manual

Premium charger for electric vehicles
Hide thumbs Also See for LUMINA:
Table of Contents

Advertisement

Quick Links

User
manual
ENELION
Premium charger for electric vehicles
LUMINA

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the LUMINA and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Enelion LUMINA

  • Page 1 User manual ENELION LUMINA Premium charger for electric vehicles...
  • Page 2 Dear user Congratulations on your purchase of the Enelion charger and thank you for your trust. Up-to-date manuals for users and installers always available at: https://enelion.com/en/support-ENELION LUMINA/ Please read this manual before installation or prior to the station being commisioned.
  • Page 3: Table Of Contents

    Safety instructions Use of the charging station Preparation for use Charging Completion of charging Emergency stop Procedure in the event of irregularities, faults and fire General rules for safe operation Health and Safety Disposal and environmental protection Device configuration Available variants Initiating the device Changing the configuration LED bar...
  • Page 4 OCPP Connection Configuration keys Charger Overview Mains Dynamic Load Balancing DLB Overview Authorization Accessories Modbus Charging network Overview Settings System Overview Update Users Time Logs Reboot Technical data Maintenance Cleaning Operation Operation and maintenance of charging stations Technical tests...
  • Page 5 Functional tests PP contact- detection of the plug and charging cable CP contact - communication line between the vehicle and the charging station Servicing the charging station Instructionsfor replacing the ENELION LUMINA Schuko fuse Technical description Troubleshooting Alerts Frequently Asked Questions...
  • Page 6 Enelion LUMINA plug-in electronics. • Enelion LUMINA’s network SSID and password are required for installation and configuration; they can be found on the back of the charging head.
  • Page 7: Use Of The Charging Station

    Use of the Preparation for use charging Before the first use of the charger, make sure station that the charger has been correctly installed and poses no danger to the user. More information may be found in the installation quide. Charging By default the charger is configured as Freecharge configuration, which means it starts...
  • Page 8: Completion Of Charging

    fact with the light bar and showing the status on Emergency the display. While charging, the light bar flashes from the center towards the edge. See chapter LED interface for more information. When stop configuring the station as Freecharge, it is possible to disable the locking of the plug in the station before charging.
  • Page 9: General Rules For Safe Operation

    General The device meets the IP 54 standard. rules for safe operation Due to the IP 54 class of the device, it is forbidden to wash the charger with pressure washers, garden hoses, a shower or any other The device should be used in accordance with the stream of water.
  • Page 10: Disposal And Environmental Protection

    Disposal and environmental protection Electrical and electronic waste must not be disposed of together with normal household waste. According to the WEEE directive in force in the EU, separate methods of disposal must be used for electrical and electronic waste. In accordance with the provisions on waste electrical and electronic equipment, it is forbidden to put waste equipment (marked with...
  • Page 11: Device Configuration

    Device Available variants configuration The system of configuring the settings of ENELION LUMINA charger is done in the configuration panel. Available variants resulting from the configuration of the device are presented below: Type of power system ► • One–phase power system — only the first phase connected to the device will be used for charging.
  • Page 12: Initiating The Device

    1. install the charger according to the fitting instruction available on https://enelion. The above options are applicable only with offline com/en/support-ENELION LUMINA/, chargers. Deauthorizing the user in an online 2.
  • Page 13: Led Bar

    LED bar Availability Green flashing Charging (energy Blue flashing from transfer in progress) inside towards the edge The ENELION LUMINA charging station has an LED interface Charging (no energy Blue flashing that provides the user with basic transfer) information: Warning/minor error...
  • Page 14: Configuration Panel

    • Remote diagnostics and software update. Communication ENELION app available on: ENELION LUMINA charger allows you to connect to the configuration panel using its Wi-Fi Hotspot. In order to connect to the Wi-Fi Hotspot, use a computer or your smartphone to scan the...
  • Page 15: Access To The Configuration Panel

    Wi-Fi networks. The broadcast network There are accounts for the User (User) and is named Enelion-XXXX-XXXX where X signs Administrator (Admin) in the configuration stand for the charger’s serial number. Password panel. The default password for each of these...
  • Page 16: Navigation In The Configuration Panel

    Depending on the situation, not all tiles will be visible. The available tiles are: The interface of the configuration panel consists of an upper bar with the Enelion logo, common • Wi-Fi connection status, to all subpages, a side menu with the name of the •...
  • Page 17: Wi-Fi

    05.3 Wi-Fi Enelion Bridge enables Wi-Fi connectivity in Enelion Bridge is equipped with LTE cat 4 module. the 802.11 b/g/n, 2.4 GHz standard. The Wi-Fi To connect the module with GSM internet please, before powering the charging station on, make sure subpage allows you to manage the Bridge’s...
  • Page 18: Hotspot

    06.1 Connection GSM configuration window. 05.4 Hotspot ENELION LUMINA supports OCPP 1.6 over JSON. To connect to OCPP backend please use the toggle on the right of OCPP Connection header. The Status and Connection settings Hotspot section shows the status of the fields will become active and you will be able emitted Wi-Fi network and its settings.
  • Page 19: Configuration Keys

    be one Master device in the network. for editing the value of a given configuration key. If the device you are configuring is a Master Type, For read-only keys it is not possible to choose Master as device Type and fill other change their value.
  • Page 20: Mains

    07 .2 Mains In the Mains section, we can check Mains status and settings like power limit or phase sequence. Overview section of the Charger tab. Mains section of the Charger tab. To Schedule charging click Schedule icon on To change power limit click an Edit icon. A settings the right of Connector header.
  • Page 21: Dynamic Load Balancing

    Balancing For the DLB function to work correctly, the Circuit current limit value must be the same Enelion charging stations are featured with a at all charging network stations. dynamic load balancing (DLB) function. It allows all the charging stations in the network to share...
  • Page 22: Authorization

    If an Energy Guard is available in the network, The queue is rotated every 5 minutes as follows: information about it and the current it has the charger that has transferred the highest measured will be displayed at the top of the page. amount of energy to the car from the moment Otherwise, this section will be inactive.
  • Page 23: Accessories

    We can turn Schuko socket relay on or off, as well Lock state Description as delay switching it off until a specific time. Unlocked Lock is open Locked Lock is closed Unsupported The charger does not have or does not allow the use of a socket lock Possible lock status.
  • Page 24: Modbus

    The RTU server uses an RS485 connection for the transmission with the following parameters: The Enelion ENELION LUMINA charging station features a Modbus communication protocol, • baud rate: 9600, configured as a slave device.
  • Page 25: Overview

    In the Overview section, we can check password. Bear in mind that there must be one information about the ENELION LUMINA head and only one root device in the network. and Backplate hardware details. Mesh connection settings section To change Wireless Mesh settings click Edit icon and fill in fields with preffered configuration.
  • Page 26: Update

    09.2 09.3 Update Users Update section allows you to update the The configuration panel has two user accounts: charging station software using an update file. User and Admin. To update, after selecting the file with the gray button, click the Submit button. The Bridge The tabs that the user does not have access to module will start the update process, and the are: OCPP and Update.
  • Page 27: Logs

    Modbus TCP download a diagnostic file to the disk, which, in case of possible problems with the Bridge module, Numer of charging up to 100 points supported in will help the Enelion technical support diagnose a network their causes. Configuration panel...
  • Page 28: Maintenance

    The device is designed to operate in temperatures Maintenance from −30 C to +55 C. The manufacturer does not guarantee the proper functioning of the charging station in temperatures outside the specified range. Chargers that are damaged because of exposure to temperatures below −30 C or above 55 C are not covered under...
  • Page 29: Operation

    Operation Operation and maintenance of charging stations Service inspection is performed once a year. Mechanical elements such as a socket, charging cable, plug lock, require only a superficial inspection. Solid/durable components are not expected to wear out and to require replacement during the lifetime of station.
  • Page 30: Measurement Of The Resistance Of The Main Earthing Terminal - Met Grounding

    02.1 02.2 Measurement Continuity of the resistance measurement of the Main Earthing Terminal of the protective – MET grounding conductors The measurement should be made between the main potential equalization point and PE contact The Main Earthing Terminal in the station is the PE (wire input on the backplate) in the charging contact in the power connector.
  • Page 31: Measurement Of Resistance Of The Working Grounding

    02.3 Measurement of resistance When measuring the insulation resistance, of the working the supply voltage absolutely must be disconnected without any possibility of it grounding being accidentally reconnected! Perform the measurement if the working grounding has been made. The measurement If overvoltage protectors have been used in can be made by technical, compensatory, clamp the tested installation, the connection of the...
  • Page 32: Testing Resistance Of The Charging Station Insulation

    03.2 for insulation measurements. It is permissible Testing to use adapters that do not contain additional resistance circuits, being adapters for the measurement system. Otherwise, the measurement should be of the charging carried out directly on the contacts of the socket/ station insulation plug of the station, observing appropriate safety rules.
  • Page 33: Protection Against Electric Shock In Tt Systems

    to trip the overcurrent protection at the required time. To assess the effectiveness of protection, take the most favorable result. The following condition must be met: Zs Ia ≤ U0 for t ≤ 0, 4s Zs – short-circuit impedance Ia – the value of current which is able to automatic power-off in the time t ≤...
  • Page 34: Testing The Operation Of Residual Current Devices

    • Connect the RCD testing meter to the adapter 61851-1: 2019-10 standard). (vehicle simulator), • Start the charging process using the adapter - Each ENELION LUMINA station includes an the LEDs should be blue, Enelion RCMB accessory: • Follow the instructions on the meter while measuring the RCD breaker parameters, •...
  • Page 35: Rcmb Tests

    Normalized, maximum switch-off times [s] for Measurement of the actual sensitivity of RCMB: the RCDB differential current: RCMB = 0,5IΔn ≤ IΔr ≤ 2IΔn, where: IΔn = 6mA – nominal sensitivity of the 2IΔn 4IΔn 10Δn IΔn ≥5A device 0,15 0,04 0,04 Measurement of the operating time of the...
  • Page 36: Functional Tests

    Functional THE RESISTANCE VALUE OF THE RATED CURRENT CAPACITY RC (±3%) OF THE CABLE tests 220 Ω 32 A Functional tests must be carried out with a 680 Ω 20 A suitable tester. 1500 Ω 13 A Functional tests should be carried out at least once every 3 years and after each installation The state of the PP contact is checked before and service.
  • Page 37: Servicing The Charging Station

    Blue, pulsating charging station 6 V PWM Charging in progress - Status LED: Blue, The main component of the ENELION LUMINA pulsating from the charging station, which is the charging head, is center towards the edges not subject to servicing repairs. If a malfunction occurs, the charging head needs to be replaced.
  • Page 38: Schuko Fuse

    Instructions for replacing the ENELION LUMINA Schuko fuse Applies to ENELION LUMINA charging stations equipped with an additional Schuko 230V socket Additional Schuko 230V socket allows you to connect a load of no more than 10A. Switching on is controlled remotely via the application and the configuration panel.
  • Page 39 The fuse is located in the housing on the cable in the backplate part of the charger. 1. Unscrew the fuse housing. 2. Remove the blown fuse from the housing 3. Insert a new fuse specified by the manufacturer. 4. Screw on the fuse housing. Fuse: 0234010.MXP (Cartridge Fuse 250V 10A Medium Acting)
  • Page 40: Technical Description

    Technical description...
  • Page 41 ENELION ENELION LUMINA Socket – Type 2 socket Charging connector type • ENELION ENELION LUMINA Cable – Type 2 connector with 5.2 m cord Embedded residual current monitor – Enelion RCMB 6 mA DC Residual current protection Integrated 3-phase energy meter >99% accuracy Energy metering Impulse* –...
  • Page 42 • 3 x 400 V AC/ 230 V AC (±10 %) (TN/IT) Supply voltage • Possibility of connecting the cable from the top, bottom and the back of the station • configuration with no additional tools • remotely controlled Schuko outlet (max. 2000W/10A)* Other features •...
  • Page 43: Troubleshooting

    Frequently Asked Questions ENELION LUMINA CHARGER DOESN’T CONNECT TO THE Wi-Fi NETWORK Make sure the Wi-Fi password was entered correctly and that the proper security method was chosen Authentication Type box. Positioning the Wi-Fi router closer to...
  • Page 44 Customer service ENELION LUMINA CHARGER DOESN’T Download the latest user manuals, useful CONNECT TO THE GSM NETWORK documents and videos for your product on enelion.com Make sure the GSM network settings were entered correctly and that the charger is in the network signal range.
  • Page 45 Copyright, Enelion sp. z o. o. The manual may change as the product develops. All rights reserved. Revision: V 7 Number of pages: 45 Released: March 15, 2023 Enelion sp. z o.o. | 50 Pana Tadeusza St 80–123 | Gdańsk | Poland sales@enelion.com enelion.com...

Table of Contents