Finalizing the Installation

Packing List

Propane Conversion Kit (Front #60 Orifice, Rear #60 Orifice, Pilot Orifice 0.14 LP).
Thimble (sku# 250-04833)
Remote
Insulation and Heat Shield (for rear vent conversion)
Exhaust Deflector (used for min. rear vent configurations only)
Embers, Rockwool, Ember-Glass

Additional Items Required

Log Set
Direct Vent
Gas Line Equipment (shutoff valve, pipe, etc.)
Electrical Equipment (min. 14 gauge, grounded line)

Installation Overview

All requirements below must be met.
Top Vent
Configuration
See the section
"Mantel Requirements"
Drywall
Drywall
1" Min.
Side
25mm
Wall
See "Optional Non-
See "Optional Non-
Combustible Facing"
Combustible Hearth"

Recommended Installation Procedure

Frame the opening for the fireplace. Make sure to allow for vent installation.
This fireplace is designed to accommodate 1/2" (13mm) or 5/8" (16mm) drywall (see "Nailing
Brackets" on page 15 for details). Secure the fireplace to the framing.
Install the vent, gas line and electrical hook-up.
Install the drywall.
Install the hearth (if applicable).
Install the facing (if applicable).
Install the mantel (if applicable).
Finalize the installation (see page 36).
© Travis Industries
See the section
"Vent Requirements"
See the section
"Electrical Connection"
5/15/2019 - 1508
(for qualified installers only)
Rear Vent
Configuration
See the section
"Approved Vent
Configurations"
Insulation must not fill
the 1/2" (13mm)
clearance around the
back and sides of the
fireplace.
Nailing Brackets
See the section "Minimum
Framing Dimensions"
See the section
"Gas Line Installation"
Required Travis Wall Thimble
(sku# 250-04833)
564 GSR2 25K CF (AUST)
7

Advertisement

Table of Contents
loading

Table of Contents