Installation; Before You Begin; Packing List; Installation Options - Lopi Yankee Bay Instruction Manual

Pellet insert
Hide thumbs Also See for Yankee Bay:
Table of Contents

Advertisement

Before You Begin

READ THIS ENTIRE MANUAL BEFORE YOU INSTALL AND USE THIS HEATER.
FAILURE TO FOLLOW THE INSTRUCTIONS MAY RESULT IN PROPERTY DAMAGE,
BODILY INJURY, OR EVEN DEATH.
Check with local building officials for any permits required for installation of this pellet heater and notify
your insurance company before proceeding with installation.

Packing List

• Thermostat & Wire
• Leveling Bolts (2)

Installation Options:

• Masonry Fireplace

Planning The Installation

• Have an authorized Travis Industries dealer install this heater. If you install the heater yourself, have
your dealer review your installation plans.
• Place the heater outside and load 10 pounds of pellets inside the hopper. Plug the heater in and
let it run on HIGH until the pellets run out. This will cure the paint and burn off any oil on the steel,
eliminating any smell inside the home.
• Inspect the chimney and clean as necessary before installing the heater. NOTE: The convection
blower is open to the fireplace cavity and may circulate odors from the fireplace. You may wish to
paint the interior of the fireplace with latex paint to prevent odors from entering the home.

Minimum Fireplace Size

© Travis Industries

Installation

• Scraper Rod Tool
• Control Board Screws
• Factory Built (Metal) Fireplace
See "Mantel
Requirements" for
details
4 0 8 0 7 2 3
• Fuses (2)
• Fireplace Installation Sticker
• Hopper Screws
• Double-Back Tape (for panels)
• Outside Air Compatible
Min. 32-3/4"
(6-1/4" from
hopper lid)
25-3/4" - 20" See
"Hopper Extension
Set-up"
Min. 36"
(includes circuit board)
Min. 18"
Min. 36"
(6" from door
opening)
Non-Combustible Hearth
• Brush
Mantel
(combustible or non-combustible)
Min.42"
(7" from hopper
lid)
Non-Combustible
Facing
Min. 14"
1 0 0 - 0 1 1 4 5
7

Advertisement

Table of Contents
loading

Table of Contents