5.12.3 Configuring The Tig Potentiometer Torch Connection - EWM Tetrix 300 Classic Operating Instructions Manual

Table of Contents

Advertisement

Design and function
Advanced settings

5.12.3 Configuring the TIG potentiometer torch connection

Risk of injury due to electrical voltage after switching off!
Working on an open machine can lead to fatal injuries!
Capacitors are loaded with electrical voltage during operation. Voltage remains present
for up to four minutes after the mains plug is removed.
1. Switch off machine.
2. Remove the mains plug.
3. Wait for at last 4 minutes until the capacitors have discharged!
Risk of accidents if these safety instructions are not observed!
Non-observance of these safety instructions is potentially fatal!
Carefully read the safety information in this manual!
Observe the accident prevention regulations in your country.
Inform persons in the working area that they must observe the regulations!
Test!
Before re-commissioning, it is essential that an "inspection and test during operation"
is carried out conforming to IEC / DIN EN 60974-4 "Arc welding devices - inspection and
testing during operation"!
For detailed instructions, please see the standard operating instructions for the welding
machine.
When connecting a potentiometer torch, jumper JP27 on PCB T320/1 inside the welding machine
should be unplugged.
Prepared for TIG standard or up/down torch (factory setting)
Prepared for potentiometer torches
For this torch type the welding machine has to be set to torch mode 3, see chapter
"Setting torch mode and Up/Down speed".
58
DANGER
WARNING
CAUTION
Welding torch configuration
B2-
BT1
A
BT2
B
0V
C
0V
D
Uref.+10V
E
IH-Down
F
Up
G
Poti/UD ein
H
Figure 5-27
NOTE
10k
Poti-Brenner
Setting
JP27
JP27
099-000098-EW501
03.08.2011

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tetrix 400-2 classic

Table of Contents