7.2 System Power-On
● To prevent the device from being exposed to high humidity in the power-off
● After turning on the battery switch, power on the inverter. For details about
Turn on the DC switch on the battery. After the battery is installed and powered
on for the first time, the ring LED blinks for three circles. Observe the battery
indicator to check the running status.
Issue 11 (2023-04-15)
Check Item
Cables routing
Cable tie
Grounding
Switch
Cable connection
Unused terminal and port
Installation environment
NO TICE
state, you are advised to power on the LUNA2000 within 24 hours after
unpacking it. The period for which the device remains powered-off during
maintenance must not exceed 24 hours. Otherwise, condensation may cause
damage to the device.
how to power on the inverter, see the quick guide for the corresponding
inverter model.
NO TE
If no PV module is configured, press the black start button first.
Copyright © Huawei Technologies Co., Ltd.
7 System Commissioning
Acceptance Criteria
Cables are routed properly as required
by the customer.
Cable ties are evenly distributed and no
burr exists.
The PE cable is connected correctly,
securely, and reliably.
The DC switch and all switches
connected to the battery are OFF.
The AC output power cable, DC input
power cable, battery cable, and signal
cable are connected correctly, securely,
and reliably.
Unused terminals and ports are locked
by watertight caps.
The installation space is proper, and
the installation environment is clean
and tidy.