Download Print this page

Huawei LUNA2000-5-NHS0 User Manual page 76

Advertisement

LUNA2000-(5-30)-NHS0
User Manual
Connecting Cascading DC Input Power Cables (Cascading)
Connect the DC input terminals (BAT+ and BAT–) between the power control
module by referring to
Terminals
Figure 6-17 Inserting the terminal
Connecting a Signal Cable (Cascading)
Prepare a signal cable terminal for connecting the power control module.
Issue 11 (2023-04-15)
6.3.2 Installing DC Input Power
NO TE
Identify the signal terminal pins according to the following figures, and connect cables
according to
Table
6-3. When you insert the communications terminal of the power control
module, the silk screens on the two sides of the communications port are different. Insert
the communications terminal according to the following figures.
Copyright © Huawei Technologies Co., Ltd.
6 Electrical Connection
Cables.
69

Advertisement

loading