UPS5000-E-(400 kVA-600 kVA)
User Manual (60 kVA Power Modules)
For the equipment that needs to be grounded, install the ground cable first when
installing the equipment and remove the ground cable last when removing the
equipment.
Do not route cables near the air intake or exhaust vents of the equipment.
Do not directly connect aluminum cables to prevent electrochemical corrosion of
copper and aluminum.
Stay away from the equipment when preparing cables to prevent cable scraps
from entering the equipment. Cable scraps may cause sparks and result in
personal injury and equipment damage.
General Requirements
Issue 09 (2023-07-10)
WARNING
CA UTION
CA UTION
CA UTION
Follow the procedures described in the document for installation, operation,
and maintenance. Do not reconstruct or alter the equipment, add
components, or change the installation sequence without permission.
Install temporary fences or warning ropes and hang "No Entry" signs around
the operation area to keep unauthorized personnel away from the area.
Before installing or removing power cables, turn off the switches of the
equipment and its upstream and downstream switches.
If any liquid is detected inside the equipment, disconnect the power supply
immediately and do not use the equipment.
Before performing operations on the equipment, check that all tools meet the
requirements and record the tools. After the operations are complete, collect
all of the tools to prevent them from being left inside the equipment.
Before installing power cables, check that cable labels are correct and cable
terminals are insulated.
When installing the equipment, use a torque tool of a proper measurement
range to tighten the screws. When using a wrench to tighten the screws,
ensure that the wrench does not tilt and the torque error does not exceed
10% of the specified value.
Ensure that bolts are tightened with a torque tool and marked in red and blue
after double-check. Installation personnel mark tightened bolts in blue.
Quality inspection personnel confirm that the bolts are tightened and then
mark them in red. (The marks must cross the edges of the bolts.)