Tubing Installation - Thermo Scientific 2115 Series Operating Manual

Table of Contents

Advertisement

Tubing Installation

Thermo Scientific
To make tubing connections:
1. Make sure the tubing is cut off reasonably square and that no plastic
burrs or ridges are present.
2. *Mark from end of tube the length of insertion.
Tube size Insertion length
1/4 O.D. 1.75 cm (11/16")
3/8 O.D. 1.9 cm (3/4")
3. Wet the tube end with water and insert tube straight into fitting until
it bottoms out on interior shoulder and insertion mark is no longer
visible.
4. To remove tubing, push collet toward fitting body and pull on tubing.
To reuse fitting, begin assembly at Step 1.
COLLET
TYPICAL
FITTING
* *
Figure 5-6. Tubing Adapter Installation
Figure 5-7. Tubing Removal
TUBING
Nanopure TOC - UV
Section 5
Installation
5-7

Advertisement

Table of Contents
loading

This manual is also suitable for:

2117 seriesD11951D1242171487152

Table of Contents