Unpacking And Installation - TANNER Scientific Cryostat TN60 Operating Instructions Manual

Table of Contents

Advertisement

6. UNPACKING AND INSTALLATION

6.1 UNPACKING THE INSTRUMENT
In standard design you will receive the unit in a cardboard box standing on a wooden
pallet. The unit is equipped with four castors and two feet, adjustable in height in the
front.
When the instrument is delivered, check the tilt indicators and shock
watches on the packaging. If tilt indicators are activated, the shipment
i
was transported laying flat, was tilted at too great an angle or fell over
during transport. If the shock watches are activated, the instrument fell
over during transport. Note this on the shipping documents and check
the shipment for possible damage.
Open the cardboard box from the top and remove the accessories together with the
supporting foams. Then remove the cardboard box.
Remove the screws on the two fixation brackets that hold the instrument on the
wooden pallet.
Swing out the ramp on which the instrument can be rolled down off the transport
pallet. To ensure a safe transport two (2) people are required.
Carefully roll the instrument backwards over the ramp from the pallet and push the
instrument to the installation location on the castors
Extend the two front feet to stabilize the cryostat in its position by turning the
supporting screws counter clockwise.
For repacking use the original cases. Keep the packing material.
11
Manual_TN60_2021-09-001.00_EN_Tanner.docx

Advertisement

Table of Contents
loading

Table of Contents