Evm Cable Assemblies; Figure 4-1. Huber+Suhner Mxp Cable Assemblies - Texas Instruments DS560DF410EVM User Manual

Table of Contents

Advertisement

www.ti.com

4 EVM Cable Assemblies

This evaluation module uses Huber+Suhner
To inquire about purchasing cable assemblies from Huber+Suhner, contact:
Info.us@hubersuhner.com
HUBER+SUHNER Inc.
8530 Steele Creek Place Drive, Suite H
Charlotte-NC- 28273
+1 704-790-7300
There are three part numbers that TI suggests using with this EVM:
1. 85014420, MF53/1x8A_21MXP/21SMA/152: MXP-15 cable assembly. This is a lower cost cable assembly
compared to the MXP-40, but the SI performance is very good and more than adequate for 25 Gbps
operation.
2. 84099607, MF53/1x8A_21MXP/11SK/305: MXP-40 cable assembly. This cable assembly is designed
specifically for 40+ GHz. It features a male cable end and longer cable length options.
3. 84098900, MF53/1x8A_21MXP/21SK_ergo/305: MXP-40 cable assembly. This cable assembly is designed
specifically for 40+ GHz. It features a female cable end and longer cable length options.
SNLU324 – MARCH 2023
Submit Document Feedback
1 × 8 MXP cable assemblies.

Figure 4-1. Huber+Suhner MXP Cable Assemblies

Copyright © 2023 Texas Instruments Incorporated
EVM Cable Assemblies
DS560DF410EVM User's Guide
15

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DS560DF410EVM and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents