Advertisement

Quick Links

www.ti.com
User's Guide
DS560DF410EVM User's Guide
The DS560DF410 evaluation module (EVM) allows the user to quickly evaluate both the high-speed and
low-speed functionality of the DS560DF410 retimer. The DS560DF410 is a 4-channel multi-rate retimer with
integrated signal conditioning. The device supports retimed operation for PAM4 and NRZ data rates from 19.6
to 28.9 GBd. Integrated physical AC coupling capacitors (both TX and RX) eliminate the need for external
capacitors on the PCB. The DS560DF410 relies on two power supply voltages, 1.2 V and 1.8 V, managed on the
EVM through an onboard power tree.
The advanced equalization features of the DS560DF410 include a low-jitter 4-tap transmit finite impulse
response (FIR) filter, as well as receive adaptive continuous-time linear equalizer (CTLE), decision feedback
equalizer (DFE), and feed forward equalizer (FFE). This comprehensive equalization enables reach extension
for lossy interconnects and backplanes with multiple connectors as well as crosstalk. The integrated CDR
function is designed for front-port optical module applications to reset the jitter budget and retime the high-speed
serial data. The DS560DF410 implements a 2 × 2 cross-point on each channel pair, providing the host with both
lanes crossing and fanout options.
The DS560DF410 can be configured through the default I2C two-wire serial target mode, or the device can
configure itself from an external EEPROM by operating in controller mode. On-chip eye monitor and PRBS
generator and checker functions allow for comprehensive in-system diagnostics.
1 Hardware Description and Setup..........................................................................................................................................
1.1 Required Hardware............................................................................................................................................................
1.2 General Hardware Test Setup Procedure..........................................................................................................................
1.3 Hardware Configuration to Use External 25 MHz Oscillator for CAL_CLK_IN..................................................................
Description..............................................................................................................................................................6
Sequence..........................................................................................................................................6
Overview..................................................................................................................................................8
Short-Cuts......................................................................................................................................................9
2.4 DS560DF410EVM Initialization Through the Latte GUI.....................................................................................................
Documentation........................................................................................................................................................14
Content......................................................................................................................................................14
4 EVM Cable Assemblies........................................................................................................................................................
Figure 1-2. DS560DF410EVM Power Tree.................................................................................................................................
Figure 2-1. Latte Installer Window to Start Process....................................................................................................................
Figure 2-4. Latte GUI Overview...................................................................................................................................................
Figure 2-8. Vertical Eye Monitor GUI.........................................................................................................................................
Figure 4-1. Huber+Suhner MXP Cable Assemblies..................................................................................................................
SNLU324 - MARCH 2023
Submit Document Feedback
ABSTRACT

Table of Contents

List of Figures
Folder............................................................................................7
..................................................................................................7
Parameters.................................................................12
Copyright © 2023 Texas Instruments Incorporated
Connections...........................3
Circuit.......................................................................5
Initialization.........................11
DS560DF410EVM User's Guide
Table of Contents
3
3
4
5
9
15
4
6
9
10
14
15
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DS560DF410EVM and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Texas Instruments DS560DF410EVM

  • Page 1: Table Of Contents

    Documentation................................14 3.1 Supplemental Content..............................14 4 EVM Cable Assemblies................................ List of Figures Figure 1-1. DS560DF410EVM Power, Low-Speed Communication, and High-Speed Signaling Connections......3 Figure 1-2. DS560DF410EVM Power Tree..........................Figure 1-3. DS560DF410EVM Schematic Portion for CAL_CLK_IN Input Circuit...............5 Figure 2-1. Latte Installer Window to Start Process........................
  • Page 2 Table 3-1. EVM Design Layout and Other Files.........................14 Trademarks Huber+Suhner ™ is a trademark of HUBER+SUHNER AG. All trademarks are the property of their respective owners. DS560DF410EVM User's Guide SNLU324 – MARCH 2023 Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 3: Hardware Description And Setup

    Hardware Description and Setup 1 Hardware Description and Setup The DS560DF410EVM implements a power management solution to enable operation from a single 5 V/3 A supply. Figure 1-1 shows the 5 V connector location. The EVM board uses Megtron-6 low-loss dielectric material for its high-speed differential inputs and outputs.
  • Page 4: General Hardware Test Setup Procedure

    1. Check the EVM jumper settings to confirm the settings match Figure 1-1. 2. Connect a 5 V power supply to the power jack (PWR_JACK), connector J26 on the DS560DF410EVM board. 3. Check the DS2 (PWR) LED to confirm the LED light is on.
  • Page 5: Hardware Configuration To Use External 25 Mhz Oscillator For Cal_Clk_In

    – Remove the jumper connecting pins 1 and 3. – Place jumper to connect pins 3 and 5, to connect the J100 SMA connector signal to the retimer CAL_CLK_IN input pin. Figure 1-3. DS560DF410EVM Schematic Portion for CAL_CLK_IN Input Circuit SNLU324 – MARCH 2023 DS560DF410EVM User's Guide Submit Document Feedback Copyright ©...
  • Page 6: Software Description

    2 Software Description The software used to configure the DS560DF410EVM is a TI developed GUI called Latte. The latest version of Latte is available for download by request through TI's website. There are two installation files that the user needs to download and execute: the Latte framework installer file and the Latte libraries updater.
  • Page 7: Figure 2-2. Latte Installer Window To Select The Destination

    Software Description Figure 2-2. Latte Installer Window to Select the Destination Folder Select project directory as “C:\Users\<User ID>\Documents\Texas Instruments\DS560Latte”. Replace the <User ID> with the proper Windows login ID. Figure 2-3. Latte Installation Window Prior to Launch of Install SNLU324 –...
  • Page 8: Latte Functional Overview

    Continue the installation setup to complete FTDI Driver installation 2. Install the Latte Libraries updater. Follow all the instructions within the installer execution process. The installer will install the Latte device library required for configuring DS560DF410EVM Select project directory as “C:\Users\<User ID>\Documents\Texas Instruments\DS560Latte”.
  • Page 9: Useful Latte Short-Cuts

    Gpio Programmer – USB Instrument created. Missing or obsolete drivers for the FTDI chip in the DS560DF410EVM is a common error source. Windows Device Manager can be used to verify the connection between the PC and the EVM by checking the USB instantiations.
  • Page 10: Figure 2-5. Latte Gui Snapshot Showing The User Configurable Retimer Parameters From The 1_Bringupparams.py Script

    3. Check the Log window for status and errors. 2.4.3 Example: Programming DS560DF410EVM for 26.5625 GBd PAM4 Test Case In this step, the retimer device on the DS560DF410EVM is programmed. See the procedure that follows: 1. Provide a valid input signal to the DUT retimer channel.
  • Page 11: Figure 2-6. Example Latte Gui Log Window Snapshot Showing Rom Patch Load And Channel Initialization

    Set the numeric value for the pattern variable for the desired pattern. • The user can highlight the configure transmitter command lines on the Latte window and click on F7 to execute only those commands. SNLU324 – MARCH 2023 DS560DF410EVM User's Guide Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 12: Figure 2-7. Latte Gui Snapshot Showing The Usefulfunctions.py User

    Figure 2-7. Latte GUI Snapshot Showing the usefulFunctions.py User Parameters 2.4.4 Retimer Configuration The example in the previous section configures the DS560DF410EVM with the default modes set in Latte. The user can change the mode and channel by modifying the parameters in the 1_bringupParams.py Latte script.
  • Page 13 2. Set Capture type to Continuous or Finite samples from the drop-down mode. 3. Click on Start Capture to get the vertical eye in the Plot Eye data tab. SNLU324 – MARCH 2023 DS560DF410EVM User's Guide Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 14: Related Documentation

    Table 3-1. EVM Design Layout and Other Files File Description File Name Schematic PDF DS560DF410EVM_schematic.pdf Board layout file DS560DF410EVM_layout.brd Board Gerbers DS560DF410EVM_gerbers.zip Board s-parameters folder EVM/s_parameters/ DS560DF410EVM User's Guide SNLU324 – MARCH 2023 Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 15: Evm Cable Assemblies

    3. 84098900, MF53/1x8A_21MXP/21SK_ergo/305: MXP-40 cable assembly. This cable assembly is designed specifically for 40+ GHz. It features a female cable end and longer cable length options. SNLU324 – MARCH 2023 DS560DF410EVM User's Guide Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 16 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 17 www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
  • Page 18 www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
  • Page 19: Circuit

    www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
  • Page 20 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2023, Texas Instruments Incorporated...
  • Page 21 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products. TI objects to and rejects any additional or different terms you may have proposed. IMPORTANT NOTICE Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2023, Texas Instruments Incorporated...

Table of Contents