Filling Requirements - Thermo Scientific Precision Water Bath User Manual

Table of Contents

Advertisement

Section 3 | Installation

Filling Requirements

Ensure the reservoir drain port is closed and that all plumbing connections are securely plumbed
or capped. Also ensure any residue is thoroughly removed from the reservoir before filling.
To avoid spilling, place your samples/trays into the bath before filling. Also make allowance for
splashing of water from tray oscillation movement.
Slowly fill the reservoir. When adding, point the opening of a container away from yourself.
For Shaking Water Baths, fill the reservoir with a minimum of one inch and the maximum level
lower than the tray shaft fitting.
For Circulating and Coliform Baths, fill the reservoir with a minimum of two inches, ensuring the
suction screen is covered, and a maximum level one inch lower than the upper tank surface.
For General Purpose Baths, fill the reservoir with a minimum of one inch and a maximum level
one inch lower than the tank upper surface.
Note Monitor the fluid level whenever heating the fluid.
To conserve energy, reduce evaporation, and increase temperature control accuracy, use the
supplied gable cover. Do not use aluminum foil as a cover, as it may cause corrosion due to an
electrochemical reaction.
3-6 | Precision
Thermo Scientific

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents