Download Print this page

Mobatime Metroline Installation Manual

Outdoor clock, single- or double-sided, with led – illumination

Advertisement

Quick Links

Installation Manual
Outdoor Clock, single- or double-sided, with LED – illumination
For safety reasons avoid looking directly into the LEDs.
Before the installation of the clock please read this manual carefully.
1. Notes to this Installation manual
The information in this installation manual can be changed at any time without previous notice.
This installation manual has been composed with utmost care, in order to explain all details in respect of
the operation of the product. Should you, nevertheless, have questions or discover errors in this Manual,
please contact us.
We do not answer for direct or indirect damages, which could occur through incorrect use of this manual.
Please read the instructions carefully before setting-up of the product. Use the product only once you have
correctly understood all information for the installation and of the operation.
The installation must only be carried out by a skilled person.
It is prohibited to reproduce, to store in a computer system or to transfer this publication in a way or
another, even part of it. The copyright remains with all the rights with and MOSER-BAER AG – CH 3454
Sumiswald / Switzerland and BÜRK MOBATIME GmbH, D-78026 VS-Schwenningen / Germany.
2. Handling instructions
The clock must be transported upright in its original packaging and has to be stored dry.
Clean the cover glass with wet (leather-) cloth.
Never use solvents, aerosol or organic cleaning products.
The housing can be cleaned with standard cleaning agents.
3.
Electrical connections
The mains supply line may only be installed by a licenced electrician.
The nationally valid installation regulations must be complied with.
The clock does not contain a power plug. In the on-site supply line for movement and illumination, an all
wires disconnecting device and a fuse according to the consumption is to provide. Use the same phase
(nom. 230 VAC).
Maximum wire cross section of 2.5 mm² shall be used.
For all maintenance and cabling work, the clock has to be separated from the mains power supply.
© MOBATIME

Advertisement

loading
Need help?

Need help?

Do you have a question about the Metroline and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Mobatime Metroline

  • Page 1 It is prohibited to reproduce, to store in a computer system or to transfer this publication in a way or another, even part of it. The copyright remains with all the rights with and MOSER-BAER AG – CH 3454 Sumiswald / Switzerland and BÜRK MOBATIME GmbH, D-78026 VS-Schwenningen / Germany. 2. Handling instructions •...
  • Page 2 Input time signal    Movement 2   230VAC (only for movements with mains power-supply)  Movement 2 (only in double-sided clocks)  Time signal (not used for NTP clocks) The internal wiring must not be modified. © MOBATIME...
  • Page 3 Pulse I00…I11 NU 90… MOBALine M09 / M12 MLU 190… MOBALine / DCF-active M15…M18 SAM/SEM 100… IRIG/AFNOR I20…I21 IBU 190… Active DCF R45…R46 ADU 190… Time signal (from Master-clock) Connection Master Clock (DCF-active, impulse, MOBALine, IRIG-B / AFNOR © MOBATIME...
  • Page 4 19 ch. du Champ-des-Filles, CH-1228 Plan-les-Ouates Tel. +41 34 432 46 46 / Fax +41 34 432 46 99 Tel. +41 22 884 96 11 / Fax + 41 22 884 96 90 moserbaer@mobatime.com / www.mobatime.com export@mobatime.com / www.mobatime.com SALES SWITZERLAND...