Mains Supply - Bosch FPC-500 Installation Manual

Conventional fire panel
Hide thumbs Also See for FPC-500:
Table of Contents

Advertisement

14
en | Installation
holes using the built-in spirit level in the upper left corner. The
dimensions can be taken from the drilling jib on the rear of the
housing. Drill the holes.
Guide the cables routed under plaster through the punched out
cable ducts on the rear of the housing into the housing. Mount
the housing to the wall using screws. Make sure that cables are
not pinched.
Then guide the cables routed on plaster through the cable
entries to the upper side of the housing.
3.2.4

Mains Supply

The fire panel requires a 230 V mains supply for the power
supply. Route the power supply so that the line does not cross
or touch the signal line.
Use the left M 20 x 1.5 screw joint (PG13.5) on the upper side of
the panel for the 230 V mains supply.
2020.02 | 9.0 | F.01U.172.980
Conventional fire panel
PZ3
PZ3
6 x 50 mm
6 x 50 mm
S8
S8
(
(
8 x 40 mm)
8 x 40 mm)
PZ3
PZ3
6 x 50 mm
6 x 50 mm
PZ3
PZ3
Bosch Sicherheitssysteme GmbH
3x
3x
3x
3x
3x
3x

Advertisement

Table of Contents
loading

Table of Contents