Huawei BTS3900A Installation Manual page 48

Table of Contents

Advertisement

BTS3900A(Ver.B)
Installation Guide
Figure 8-2 Drilling holes on the concrete pad
(1) Concrete pad (2) Base of the
1.
2.
3.
4.
5.
Issue 01 (2011-10-25)
cabinet
Use a hammer drill with bit 16 to drill holes at the anchor points, and ensure that the depth
of each hole ranges from 52 mm to 60 mm.
CAUTION
l Do not drill holes through the holes in the base by using a hammer drill. Drilling holes
through the holes in the base may damage the paint on the base.
l Take proper safety measures to protect your eyes and respiratory tract against the dust
before drilling holes.
Use a vacuum cleaner to clear the dust inside and around the holes. If the inter-hole spacing
is too wide or too narrow, locate and drill holes again.
Slightly tighten the expansion bolt, and then put the expansion bolt assembly into the hole
vertically.
Use a rubber mallet to hammer the expansion bolt until the expansion tube is buried into
the hole, and then tighten the bolt.
Remove the bolt, spring washer, and flat washer counterclockwise.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
(3) M12x60 bolt (4) Spring washer (5) Flat washer (6) Expansion tube
8 Installing the Base
39

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bts3900a wcdmaBts3900a lteBts3900a gsm

Table of Contents