Figure 12-49 Installing the monitoring signal cable in the scenario of 1 RFC+1 APM30H+2
IBBS200Ds/IBBS200Ts+1 TMC11H (3)
Step 4 Attach labels to the installed cables. For details, see Attaching an L-Shaped Label.
Step 5 Run each cable that leave the cabinet in a PVC corrugated pipe, and then tie the pipe to the cable
hole in the cabinet.
Step 6 If two RFCs, two APM30Hs, four IBBS200Ds/IBBS200Ts, and one TMC11H are configured
on site, four more monitoring signal cables are required.
of the cabinets.
Figure 12-50 Configurations of two RFCs, two APM30Hs, four IBBS200Ds/IBBS200Ts, and
one TMC11H
Issue 01 (2011-10-25)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
12 Installing the Cables
Figure 12-50
shows the configurations