Huawei BTS3900A Installation Manual page 155

Table of Contents

Advertisement

BTS3900A(Ver.B)
Installation Guide
Figure 12-66 Installing Inter-BBU Signal Cable
Step 3 Install the cable on the BBU1 side, For details, see Installing Optical Modules and Cables.
1.
2.
Step 4 Attach labels to the installed cables. For details, see Attaching an L-Shaped Label.
----End
Issue 01 (2011-10-25)
Install the same type of optical module to the port S0 on the UCIU on BBU1.
NOTE
The optical modules with the same label are of the same type.
Insert one end of the DLC connector labeled 1A and 1B on the cable into the optical module.
CAUTION
The TX and RX ports on one UCIU must be connected to the TX and RX ports, respectively.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
12 Installing the Cables
146

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bts3900a wcdmaBts3900a lteBts3900a gsm

Table of Contents