BTS3900A(Ver.B)
Installation Guide
3 Information About the Installation
The BTS3900A supports combinations and configurations of different types of cabinet. You
need to familiarize yourself with the related information and clearance requirements before the
cabinet installation.
4 Unpacking the Equipment
Unpack and check the delivered equipment to ensure that all the materials are included and intact.
5 Obtaining the ESN
The Electronic Serial Number (ESN) is a unique identifier of a Network Element (NE). Record
the ESN for later commissioning of the base station before installation.
6 Installation Procedure
The installation procedure for the BTS3900A involves installing the base, the cabinet, the
optional modules, and the cables, checking the installation, performing the power-on check, and
doing some subsequent operations.
7 Checking the Installed Cables and Modules
The internal modules and cables are installed in the BTS3900A cabinet before delivery. You
need to check whether the modules and cables work properly on site.
8 Installing the Base
This section describes the procedure and precautions for installing a base on the concrete floor.
9 Installing the Cabinet
When installing the BTS3900A cabinet on site, select an appropriate method based on the
outdoor conditions.
10 Installing the PGND Cable and Equi-potential Cable
The PGND cable is used to connect the PGND bolts on the cabinets to the PGND grounding
bars on site, ensuring that the cabinets are properly grounded. The equi-potential cable is used
to connect the PGND bolts on the cabinets, ensuring the equi-potential connections between the
cabinets.
11 Installing Optional Modules
This chapter describes the installation of optional modules and the connection between the
optional modules and the external devices.
12 Installing the Cables
The BTS3900A cabinet is delivered with boards installed, and the internal cables are already
installed. Therefore, only the external cables and cables for the optional modules need to be
installed on site.
13 Installation Checklist
After the cabinets and devices are all installed, you need to check the installation items,
installation environment, and cable-related items.
14 Performing the Power-On Check
Before the cabinets start working, you need to check the power-on status of the cabinets.
Issue 01 (2011-10-25)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
About This Document
iii

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bts3900a wcdmaBts3900a lteBts3900a gsm

Table of Contents