Bartec PBTC-200 Operation And Installation Manual page 30

Junction box with electronic thermostat module
Table of Contents

Advertisement

Operation and Installation Manual PBTC-200
 Unscrew and remove the screw cap from the cable gland body of the cable bushing. Use adjustable spanner
 Slide the screw cap onto the power cable
21-54C3-7D0001/-
Notice: Technical data subject to change without notice.
04/2021-EHT-441168
No claims for damage arising from alternations, errors or misprints shall be allowed.
25
26
Page 28 / 45

Advertisement

Table of Contents
loading

This manual is also suitable for:

27-54c2-4412/e210

Table of Contents