Hitachi Content Platform S Series Manual page 131

Node refurbishment
Table of Contents

Advertisement

2. Pull the cable management arm away from the enclosure, allowing the
small stud on the left arm to slide out of the slot on the right arm.
3. While pushing in the tabs on both sides of the front of the enclosure
behind the front panel, pull the enclosure forward a few inches out of the
rack.
4. Unwrap and remove the five Velcro strips that are wrapped around the
power and SAS cables in the cable management arm. Place the Velcro
strips in the enclosure accessory box.
5. Move the power cable out of the cable management arm, passing the
cable out through the opening at the rack end of the arm.
6. Move each SAS cable out of the cable management arm, passing the
cable out through the opening at the rack end of the arm.
7. Place the power cable in the enclosure accessory box.
8. Using the #1 Phillips screwdriver, unscrew and remove the pin that
attaches the cable management arm to the cable management arm
extender.
9. Pull the cable management arm away from the cable management arm
extender.
10. Using the #1 Phillips screwdriver, screw the pin you removed in step 8
into the pin holes in the cable management arm extender.
11. Place the cable management arm in the enclosure accessory box.
Chapter 4: Refurbishing an HCP S30 Node
HCP S Series Node Refurbishment
Step 18: Unrack and pack the enclosures
121

Advertisement

Table of Contents
loading

Table of Contents