Inverter Status LEDs

Your Redback inverter is equipped with an LED array to indicate
system status and aid diagnosis.
The table below lists LED indications, probable cause, and
rectification steps you can try yourself. Refer to page 9 to identify
controls.
If the problem is not solved contact your installer for assistance.
LED
COLOUR &
NAME
PATTERN
SYSTEM
READY
SOLAR
ARRAY
UTILITY
GRID
ENERGY
FLOW
MEANING AND OR
PROBABLE CAUSE
System ready
System starting
Wait up to 15 minutes after a restart- this may be normal behaviour. The
system may cycle several times during start-up. Completion of start-up
process is indicated by the LED stabilising to ON.
Check the UTILITY
Grid is not available
GRID LED
PV or batteries are
During daylight,
check SOLAR
not installed or are
ARRAY LED
connected correctly.
Check BATTERY
LED
System is not
Contact your installer if LED remains OFF for more than one minute
operating
following a restart.
Array 1
Array 2
Active
Active
Not
If only one array is installed, the other array will indicate as Not Active.
Active
Active
Contact your installer if you have two arrays installed.
At night, both Arrays indicate Not Active.
Not Active
Active
Not Active
Not
Ensure PV ARRAY DC isolator is ON (clockwise to 12 o'clock).
Active
At night, both arrays indicate Not Active.
Grid active and
connected
Grid is active but not
This may be normal behaviour after a restart- wait up to 90 seconds. The
connected
LED stabilises to ON when connected.
The inverter checks the grid quality prior to- and after connection and will
Grid power does not
disconnect if Grid voltage, frequency or harmonics are outside the
comply with AS4777.2
allowable range.
Grid is not active
Normal behaviour during a Grid outage. If grid is available:
Turn grid isolators ON.
Consuming energy
from grid (a.k.a.
buying)
Sending energy to
grid/zeroing
Supplying energy to
grid (a.k.a. selling)
Grid not connected or
Check
UTILITY GRID
system not operating
LED.
SOLUTION(S)
OK. No action required.
OFF: Grid is not connected. Turn grid isolators ON.
FLASHING: Contact your installer
OFF: Turn PV ARRAY DC isolator ON (clockwise to 12
o'clock).
ON: PV is detected.
OFF, and batteries are installed: Turn BATTERY
SYSTEM DC isolator ON (up).
OK. No action required. Both arrays are active.
OK. No action required.
No action required- this is normal operation. When (Instantaneous PV +
Battery power) exceeds House Demand, the shortfall is met by the grid.
If Batteries are not fulfilling house demand as expected, contact your
installer.
No action required- this is normal operation: The house demand is
being fulfilled by the battery and or PV.
No action required: this is normal operation. Power is exported to the
grid when PV exceeds (Battery charging + House demand). Contact your
installer if this is unexpected behaviour e.g. exporting while the battery
is not full and not charging.
OFF: Turn grid isolators ON.
ON: Contact your installer or Redback.
Owner's Guide – Redback Smart Hy brid System - v3.8
Redback Technolo gies
25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Be13200Be14000

Table of Contents