Fig. 12
EHP System II / II E Tire Changer Operation Manual

2.2 BEAD BREAKER INSTALLATION

Sometimes the side mounted Bead Breaker is shipped
from the factory dismounted for a more compact shipping
package.
Cut the plastic tie strap which secures the Breaker
A.
Arm to the cabinet pivot.
Place the bead breaker arm #1 (Fig.12) inside arm
B.
support #4. Holes #5 for the arm and arm support must
match. Grease pin #6. Lock arm #1 to support #4 with
pin #6 and ring #7.
Attach spring #3 (Fig.12) to the hook on the frame
C.
and attach it to hook #2 on bead breaker arm.
TIP: You may tie a small rope or cord onto the free end of
the spring, run the cord through the hole. Pull the spring
end toward the split pin and loop free end over.

2.3 AIR INSTALLATION

WARNING!
THE AIR INSTALLATION MUST BE MADE ONLY BY
LICENSED PERSONNEL.
WARNING!
EXCESSIVE AIR PRESSURE CAN SERIOUSLY INJURE
PERSONNEL AND DAMAGE THE MACHINE.
Ensure that the line pressure is within the limits required
by the machine. If the pressure exceeds 170 psi (12 bar) it
is mandatory to install a pressure regulator before the air
inlet of the machine.
If the air pressure is lower than the minimum required of
110 psi (8 bar) the clamping power of the turntable and the
bead breaker power may be insufficient for certain tires
and substantially reduces tire changer performance.
It is suggested that the air supply be equipped with a water
separator/dryer type modification for maximum
performance.