Hydraulic Track Tensioning System - Check Pressure Accumulators - Komatsu 06253 Operation & Maintenance Manual

Hydraulic mining shovel
Table of Contents

Advertisement

MAINTENANCE
4.12.5 HYDRAULIC TRACK TENSIONING SYSTEM - CHECK PRESSURE
ACCUMULATORS
Before working on any part of the hydraulic track tensioning
system relieve all pressure in the system by opening pres-
sure relief cock (5), illustration Z 20371.
NOTICE
For checking the charging pressure a special testing and fill-
ing device must be used. This device can be ordered from
your Komatsu Dealer.
The testing and filling procedure of the pressure accumula-
tors has to be carried out in accordance with Service Bulletin
No. AH01531 filed in volume 2 binder.
Legend for illust. Z 20371:
(1)
Rotary distributor
(2)
Supply line, pilot pressure from travel brake release circuit
(3)
Return oil line (leakage oil)
(4)
Valve block
(5)
Pressure relief cock for hydraulic track tensioning system.
"C" - Closed (Normal working position)
"O" - Open
(6)
Shut-off cock in supply line
"O" - Open (Normal working position)
"C" - Closed
(7)
Two stage pilot pressure operated relief valve
(8A)
Pressure accumulator, high pressure (150 bar)
(8B)
Pressure accumulator, low pressure (31 bar)
(9)
Shutoff cocks, RH & LH
"O" - Open (Normal working position)
"C" - Closed
(10)
Track adjusting cylinders, inner
(11)
Track adjusting cylinders, outer
(12)
Test connectors and vent valves
WARNING
4.12 EVERY 1000 OPERATING HOURS OR EVERY 6 MONTH
395

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc3000-6

Table of Contents