Load Management - Project EV Dual Wall Pro Earth User Manual

Dual outlet wall ac charger
Table of Contents

Advertisement

Load Management

Dual Wall Pro Earth
Dynamic Load Management
For dynamic load management to work the Modbus Meter must be installed correctly and
the following setting must be set:
- Enable Power Allocation - Enabled
- External current sampling method - Meter
- External monitored max input power (kw) - main fuse size
- Meter Address - Side Of Meter
External monitored max input power is measured in kw and must be set to the main fuse
size so that if the load on the property was to reach the limit set the charger would reduce
it's output accordingly to not exceed the property main fuse.
60A = 13kw
80A = 18kw
100A = 23kw
Static Load Management
For installations where dynamic load management is not possible you can hard limit the
charger using setting 'charger maximum output current (A)' - As default this will be 32A,
however can be downrated to as low as 6A (1.76kw) if required and anything inbetween.
13
d. Some routers have 2 WiFi signals, one is 2.4GHz, the other is 5GH
use the 5GHz WiFi as their default WiFi but the charger can only con
WiFi. So if the charger can connect to your mobile phone hotspot, b
to the home WiFi please check the router to see if you are using the
2.4GHz WiFi for charger connection.
30

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eva-07d-se-wEva-22d-se-wEva-07d-se-w-cEva-22d-se-w-c

Table of Contents