Fault Code; Power Management - Project EV ATESS EVA-11S Quick Installation Manual

3-phase ac charger
Table of Contents

Advertisement

5.3Fault code

Fault code
No.
1
100
2
101
3
102
4
103
5
104
6
105
7
106
8
107
9
108
10
109
11
110
12
111
13
1000
Definition description
Emergency stop pressed,
or emergency stop is broken
L3 phase overvoltage
L3 phase undervoltage
L2 phase overvoltage
L2 phase undervoltage
L1 phase overvoltage
L1 phase undervoltage
Three phase undervoltage
Over current
Over temperature
RCD Leakage Protection
485 error
Other errors
VI.Introduction of power management
and off-peak charging

6.1 Power management

The working principle of power management is as below,
Assume the max current can be supplied to the property is 40A, then the max power
is 40Ax230V = 9.2kW. So you can set the max power import to 9.2kW.
If CT is used to detect power import, then select CT as the power sampling device in
the parameter setting page. The charger will adjust charging power according to the
real-time power import and max power import.
When real-time import exceeds 90% of the preset max import value, the charger will
decrease charging power at a rate of 2A/sec until the real-time value drops between
80%-90% of the max value.
When real-time import drops below 80% of the max value, the charger will increase
charging power at 2A/sec until the real-time import falls between 80%-90% of the
max import value
.
Block diagram of power management