Power Source; Isolation; Surge Suppression; Power Requirments - Redline Connect Series Installation Manuallines

Hide thumbs Also See for Connect Series:
Table of Contents

Advertisement

CONNECT-OWS
3.10

Power Source

The installer must provide a compatible power source for the Connect-OWS system.
DC supply connections are located on the front panel of the PoE unit. This is a keyed Buchanan
796864-5 (or equiv.) connector (removable screw-type terminal block). Dual isolated floating
power supply inputs are provided to accommodate deployments with backup power (e.g., A + B
battery banks). All power inputs include overvoltage and reverse polarity protection.

Isolation

The installer must provide pluggable terminal blocks in the cabinet to isolate the PoE for
installation and servicing.

Surge Suppression

Surge suppression must be provided if the power source is external from the cabinet
(e.g., built-in to terminal blocks).
for the power cable ingress into the shelter or cabinet.

Power Requirments

The Connect-OWS system requires up to 17 W of power. The supply cable may be 12 to
22 AWG.

Cable Hangars

It is important to provide strain relief, drip loops and protection against vibration and
abrasion caused by the wind, sand etc. The installer must provide suitable cable
hangars for the power cable, spaced at a recommended maximum of 450 -610 mm (~18
- 24 in).
70-00200-02-00
Installation Guidelines

Figure 26: Site Survey: Connect-OWS Power Survey

: System installation must include dedicated outdoor rated surge protection

Table 21: Site Survey: Power Requirements

Power
Wire Gauge
Proprietary Redline Communications © 2014
< 17 W
12-22 AWG
Page
36
of 70
December 3, 2014
The

Advertisement

Table of Contents
loading

This manual is also suitable for:

Connect-ows

Table of Contents