Site Survey; General Information; Network Settings; Table 14: Site Survey - General Information Settings - Redline Connect Series Installation Manuallines

Hide thumbs Also See for Connect Series:
Table of Contents

Advertisement

CONNECT-OWS
3

Site Survey

It is recommended to perform a site survey before installing the Connect-OWS system.
The data accumulated during this process is necessary to understand the operating
characteristics and obtain the best performance from the wireless system.
3.1

General Information

The General Information fields uniquely identify each installed system. It is
recommended to record this information prior to installation.
Setting
Name
Details
Location
Contact
3.2

Network Settings

The Connect-OWS must be assigned two unique IP addresses before it is connected to
the base station and the local area network (LAN). When DHCP is enabled, the
remaining settings are populated automatically by the DHCP server.
Setting
Network
DHCP Enable
IP Address
Subnet Mask
IP Gateway Address
DNS Server 1
DNS Server 2
Syslog Settings
Enable Syslog
Server IP
70-00200-02-00
Installation Guidelines

Table 14: Site Survey - General Information Settings

Serial Gateway
Table 15: Site Survey - Network & Syslog Server Settings
Serial Gateway
Proprietary Redline Communications © 2014
Chapter 3
Radio Management
Radio Management
Page
26
of 70
December 3, 2014

Advertisement

Table of Contents
loading

This manual is also suitable for:

Connect-ows

Table of Contents