Manual
00809-0100-4007
In normal operation, the two block valves between the process and instrument ports will
be open, and the equalizing valves will be closed.
A. Test (plugged)
B. Isolate (open)
C. Process
D. Equalize (closed)
E. Equalize (closed)
F. Drain vent (closed)
G. Process
H. Isolate (open)
I. Test (plugged)
Procedure
1. Close the block valve on the low pressure (downstream) side of the transmitter.
Emerson.com/Rosemount
A. Test (plugged)
B. Isolate (open)
C. Process
D. Equalize (closed)
E. Equalize (closed)
F. Drain vent (closed)
G. Process
H. Isolate (closed)
I. Test (plugged)
Hardware installation
March 2023
61