Huawei LUNA2000-200KWH-2H1 Quick Manual page 29

Smart string energy storage system
Hide thumbs Also See for LUNA2000-200KWH-2H1:
Table of Contents

Advertisement

3. Connect the preinstalled cables to J1 (left), J2 (right), and FE1.
When securing the network cable (as shown by ⑥ in the figure), hold the cable and align it
with the FE network port. After the network cable is properly installed, do not release it.
Use the other hand to tighten the nut of the RJ45 connector.
After the network cable is installed, gently pull it down to check that it is properly installed.
4. Install the maintenance compartment cover and decorative cover of the rack controller, and
place the magnetic rings.
28

Advertisement

Table of Contents
loading

Table of Contents