Huawei LUNA2000-200KWH-2H1 Quick Manual page 31

Smart string energy storage system
Hide thumbs Also See for LUNA2000-200KWH-2H1:
Table of Contents

Advertisement

Installing Auxiliary AC Power Cables (with External Grid
5.6
Power Supply)
Installing Single-Phase AC Input Power Cables (Without External
5.7
Grid Power Supply)
If a UPS or other reliable backup power supply is used, perform the following steps to
connect single-phase AC input power cables.
Recommended UPS input switch specifications: 230/400 V AC 32 A/2P.
1. Remove the short-circuiting bar from 1–2 and insert it to 2–3 on the XU terminal block.
2. Remove the short-circuiting bar from 4–5 and insert it to 5–6 on the XU terminal block.
3. Connect the cables.