Installing Cables for the Rack Mounted Fire Extinguishing System
5.2
Take out the reserved cables and install them to the rack mounted fire extinguishing system.
Ensure that the cables are correctly installed. If a fire occurs when cables are not connected or
incorrectly connected, the ESS cannot actively extinguish the fire.
5.3
Installing Battery Pack Cables
1. Install copper bars for battery packs, and connect the battery rack general output power
cable and black start cable.
One end of the battery rack general output power cable and black start cable is preinstalled
before delivery.
There are four types of copper bars delivered with the product: A, B, C, and D.
Copper bar D must be installed before copper bar B.
There are two types of M10 nuts for securing copper bars. Select a 15 mm or 16 mm socket
based on the site requirements.
When installing a nut, manually insert the nut into the screw plate, and then use a socket
wrench to completely secure the nut in place. This prevents the screw thread from being stuck
or stripped due to the deviation of the nut position.