gefran ILI Series Original Operating Instructions page 10

Pressure sensors for high temperature io-link impact
Table of Contents

Advertisement

ORDER CODES FOR TOOLS and ACCESSORIES
MOUNTING BRACKET
CLEANING TOOL KIT
1/2-20UNF
M18x1,5
5.3. TORQUING THE SENSOR
Screw the sensor after checking the correct shape of the side.
Hold the flexible part while screwing the jam bushing.
For safety operations at least 6 pitch of the jam bushing must be screwed into the hole.
The torque must be 40 Nm.
5.4. CONNECTING AMPLIFIER (only for modular versions)
The electronics must be connected to the primary part by aligning the 2 red points on each connector.
Take care not to force the connectors together: check the correct aligning of the 2 red points.
Screw the sensor after checking the correct shape of the side.
Hold the flexible part while screwing the jam bushing.
flexible sheath to the machine. Take care not to fix the sheath to parts heated at over than 220°C.
Screw the electrical cable connector to the electronics and switch on the sensor.
Wait 60 seconds before starting to operate the transducer.
To disconnect the electronics from the primary sensor, take care to handle the two connectors next to the red points and not to
force the disconnection.
Remark:
In modular versions the decoupling between the electronics and the primary element is not allowed.
10
SF 18
CT
12
18
DUMMY PLUG
1/2-20UNF
M18x1,5
DRILL KIT
1/2-20UNF
M18x1,5
80618_MAN_IO-LINK IMPACT_12-2019_ENG
SC
12
18
KF
12
18

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ili0Ili1

Table of Contents