5. INSTALLATION

DANGER!
Make sure the AC power supply is disconnected and protected against acciden-
g
tal energization before starting the installation;
Check the motor direction of rotation, turning it without load before it is coupled
g
to the load;
To prevent accidents, ensure that the grounding connection has been performed
g
according to the applicable standards and that the shaft key has been securely
fastened before the motor is started;
Do not lift and/or carry the product holding by the input cables.
g
Motors must be only installed in places compatible with their mounting features and in applications
and environments for which they are intended.
Those motors with feet must be installed on bases duly planned in order to prevent vibrations and
assure perfect alignment. The motor shaft must be properly aligned with the shaft of the driven
machine. Incorrect alignment, as well as improper belt tension, will certainly damage the bearings,
resulting in excessive vibrations and even causing the shaft to rupture. The admissible shaft radial
and axial loads for standard bearings are specified on the table below. Use flexible coupling when-
ever possible.
Direction
Vertical shaft
Axial*
Vertical shaft
Radial**
6 | WECM / Emerald eZA Manual
Maximum permissible thrust - Fr in (kN) 26280 hours
Mounting
Type
position
Pushing
Horizontal
Pulling
Pushing
down
Pulling
Pushing
up
Pulling
All
L/2
Table 1 - Allowed loads for Emerald eZA (NEMA 48) motors
1500rpm
Force (kN)
0.31
0.17
0.35
0.14
0.27
0.23
L
0.11
0.19
1800rpm
3000rpm
Force (kN)
Force (kN)
0,29
0.25
0.16
0.12
0.33
0.27
0.14
0.10
0.27
0.23
0.20
0.15
0.11
0.12
0.19
0.16

Advertisement