2.
Rack Installation Specifications
Rack Installation Requirements
●
Example of an Installation for a Mainframe Connection
Power distribution units (horizontal type) are installed in the lower part of each rack.
•
SCCI/PPC is installed on the front side of the base rack. The position is the same as the power distribution unit
•
on the back side.
A single frontend enclosure is installed in a base rack.
•
Install controller enclosures and drive enclosures on a per node basis.
•
Install the enclosures in ascending order starting from the node with the smallest controller enclosure num-
ber.
Figure 34 Example of an Installation to 19-inch Racks (for GS, 1800mm) (When Connecting Two or Less Drive
Enclosures per Node)
Base rack (front)
DE
DE
CE#2
DE
DE
CE#1
DE
DE
CE#0
FE
SCCI / PPC
PPC
FUJITSU Storage ETERNUS DX8100 S3/DX8700 S3/DX8900 S3 Hybrid Storage Systems Site Planning Guide
Base rack (rear)
Expansion rack #0
DE
DE
CE#2
DE
DE
CE#1
DE
DE
CE#0
FE
PDU#3
PDU#2
PDU#1
PDU#0
53
Copyright 2020 FUJITSU LIMITED
DE
DE
CE#3
PDU#1
PDU#0
P3AM-9422-13ENZ0