13. Attach the radiation sheet 0.5 (30X30).
Note
Check that the radiation sheet 0.5 (30X30) covers the CPU completely.
14. Put four compression springs and four step washers on the heat sink.
15. Press the center of the heat sink and tighten the screws temporarily in diagonal sequence.
16. Tighten the screws to the specified torque in the following sequence: (a), (b), (c), (d).
Step washers
Compression springs
Heat sink
Radiation sheet
0.5 (30X30)
17. Assemble the unit by reversing the steps of "Preparation".
PWS-110RX1A
B2.6 x 5
(c)
(b)
(a)
(d)
5-31