Huawei iSitePower-M User Manual page 45

Hide thumbs Also See for iSitePower-M:
Table of Contents

Advertisement

iSitePower-M (MAP05A1, MAB05B1)
User Manual
Figure 5-12 Solar-grid-genset hybrid scenario network diagram (multiple products
connected in parallel)
In the solar-grid-genset hybrid scenario, the power system works circularly as
follows. The power source preference sequence is solar power > grid > battery >
genset.
1.
2.
3.
4.
5.
Issue 02 (2021-12-30)
If both solar power and grid power are available and batteries are fully
charged, solar power is preferentially supplied to loads. If solar power is
insufficient, both solar power and battery supply power loads.
If both solar power and grid power are available, the grid power is supplied to
loads and solar power charges batteries when batteries discharge to the cut-
off capacity.
When solar power is available but grid power is unavailable, if solar power is
sufficient, it is supplied to loads and charges batteries; if solar power is
insufficient, solar power and batteries power loads at the same time.
When solar power is unavailable but grid power is available, grid power is
supplied to loads and charges batteries.
If neither solar power nor grid power is available, batteries supply power to
loads. When the battery DOD reaches the specified value, the genset is
started. If grid power is available or the batteries are fully charged, the genset
is shut down.
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 Application Scenarios
40

Advertisement

Table of Contents
loading

This manual is also suitable for:

Map05a1Mab05b1

Table of Contents