Internal View - NEC BladeServer Express5800 Series User Manual

Hide thumbs Also See for BladeServer Express5800 Series:
Table of Contents

Advertisement

Internal View

CPU Unit
1
12
11
1
Lithium battery
2
DIMM socket
#1, #5, #9, #2, #6, #10, #11, #7, #3, #12, #8, #4 from top
3
Heat sink
Install the processor #1 (CPU #1) below this heat sink.
4
Type II mezzanine slot
Slot to install mezzanine card .
5
Type I mezzanine slot
Slot to install mezzanine card .
6
MP connector
Used to connect with the midplane in the Blade Enclosure.
7
MAC address label
8
Connector for signal cable (2)
8-1
Connect the signal cable (2)-A of the storage unit.
8-2
Connect the signal cable (2)-B of the storage unit.
9
Dummy heat sink
Install the processor #2 (CPU #2) below this heat sink.
10
Connector for signal cable (1)
Connect the signal cable (1) of the storage unit.
11
SUV connector
12
Eject lever
2
3
10
9
General Description 2-7
4
5
8-2
8-1
6
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

N8400-071afN8400-072afN8400-073afN8400-074af

Table of Contents