NEC BladeServer Express5800 Series User Manual page 251

Hide thumbs Also See for BladeServer Express5800 Series:
Table of Contents

Advertisement

13.
Push the mezzanine card firmly to connect the card to the slot.
14.
Tighten the screws to secure the mezzanine card to the spacer on the storage unit.
15.
Replace the CPU unit tray.
IMPORTANT:
16.
Secure the CPU unit with the four screws.
17.
Connect the cable to the connector for signal cable (1).
18.
Install the bracket.
IMPORTANT:
19.
Secure the bracket with the two screws.
20.
Connect the cables to the connectors for signal cable (2)-A and (2)-B on the CPU unit and
the storage unit.
IMPORTANT:
connectors.
21.
Replace the top cover.
22.
Secure the top cover with the two screws.
23.
Install the CPU blade in the Blade Enclosure according to the User's Guide of the Blade
Enclosure.
24.
Power on the CPU blade. Make sure that no error messages associated with the card
appear on the POST screen.
See Chapter 8 for details of POST error messages.
25.
In the BIOS Setup utility, set [Advanced] – [Reset Configuration Data] to [Yes].
This is required to update the hardware update information. See Chapter 4 for details.
26.
Run the BIOS configuration utility of the mezzanine card to configure it.
The BIOS configuration utility may vary depending on the type of the mezzanine card.
Refer to the documentation provided with the card for details.
Pay attention to the cable removed in Step 9.
Pay attention to the cable connected in Step 17.
Be sure to connect the appropriate cables to the
Upgrading Your Server 9-27

Advertisement

Table of Contents
loading

This manual is also suitable for:

N8400-071afN8400-072afN8400-073afN8400-074af

Table of Contents