Installation checklist 73
Make sure that ...
There are no tools, foreign objects or dust from drilling inside the drive.
The cover(s) of the motor connection box are in place. Cabinet shrouds are in place and doors
are closed.
The motor and the driven equipment are ready for power-up.
The coolant connections between cubicles (if any) and to the cooling circuit are tight.
If the drive is equipped with a cooling unit: Make sure that the mechanical and electrical installation
of the cooling unit is completed. Refer to the cooling unit documentation.