Replacing an Expansion Module ESM Canister
Quantum DXi6900 G1 User's Guide
2 Tighten the thumbscrew that secures the new battery to the
controller canister.
3 Reinstall the top cover on the controller canister.
4 Remove the controller air blocker from the controller slot.
5 Slide the replacement Array module controller into the empty bay
until the controller snaps into place, and push the handles into the
closed position (see
6 Connect the SAS cables to the controller with the new BBU (see
Cabling Diagrams
7 Reset the BBU installation date:
a Access the Service Menu (see
Menu
on page 38).
b Navigate to Hardware Configuration > Setup external
Storage > Reset Array BBU date.
c Follow the prompts to reset the age counter of the replacement
BBU. Make sure to specify the correct Array module.
8 Run Factory Detect Hardware from the Service Menu to detect the
new hardware (see
9 In the remote management console, delete any administrative alerts
and close any service tickets.
This section describes how to remove and replace the ESM canister in a
DXi6900 G1 Expansion module (EBOD) and contains the following
sections:
•
Obtaining a Replacement Expansion Module ESM Canister
•
Replacing an Expansion Module ESM Canister
Chapter 3: FRU Removal and Replacement Procedures
Replacing an Expansion Module ESM Canister
Figure
130).
on page 229):
Accessing the DXi6900 G1 Service
Factory Detect Hardware
on page 44).
203