5.4.1

Overview of the regulatory CLM process

The overall regulatory approval process flow for end-products includes the following checkpoints:
1. Customer receives the MFG firmware for radio testing.
2. Customer creates the test plan and prepares the samples for regulatory testing. See also
JODY-W1 radio test guide, application note [11].
3. Test lab takes measurements and records the maximum passing output powers.
4. Test lab creates a test report with passing output power and results.
5. Customer submits the list of countries and power tables to u-blox or Infineon.
6. Infineon creates the product specific CLM. This process typically takes around one week.
7. A new CLM will be released if changes to the power levels are needed or the country list is
updated.
For further information about the regulatory approval process with the JODY-W1 series modules,
contact
your local u-blox support team.
UBX-16012621 - R18
C1-Public
JODY-W1 series - System integration manual
Regulatory compliance
Page 63 of 72

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jody-w163-aJody-w164-aJody-w167-aJody-w174-a

Table of Contents