Chapter 4: Starting The Vector Elite System And Software; Turning The System On And Off - Bioness vector ELITE Clinicians Manual

Body weight support system
Hide thumbs Also See for vector ELITE:
Table of Contents

Advertisement

Starting the Vector Elite System and Software

Turning the system on and off

1. Turn the power switch, located on the wall mounted power station, to the on position. See
Figure 4-1.
2. A green light will appear on the power station. The Elite Trolley will initialize and after
approximately 90 seconds a green light on the posterior of the trolley body will appear indicating
that the power is on and the system started properly.
3. After the power has been turned on, turn on the touch screen PC and log into the Windows
operating system.
Note: The power may be left on between training sessions. Turn the power off if the system is not
expected to be used for an extended period of time (e.g. several hours). To turn the system off flip the
power switch on the power station to the off position.
Figure 4-1: Power Switch
Chapter 4 - Starting the Vector Elite System and Software
4
Chapter
7

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the vector ELITE and is the answer not in the manual?

Table of Contents