Page 1
Manufactured by: Motoppar Indústria e Comércio de Automatizadores Ltda without first reading the Av. Dr. Labieno da Costa Machado, 3526 - Distrito Industrial - Garça - SP - CEP 17406-200 - Brasil User’s Manual. CNPJ: 52.605.821/0001-55 P31343 - 12/2022 Rev. 0 www.ppa.com.br | +55 14 3407 1000...
TABLE OF CONTENTS IMPORTANT SAFETY INSTRUCTIONS ..................4 TECHNICAL FEATURES ........................5 TOOLS REQUIRED FOR INSTALLATION ..................6 ELECTRICAL INSTALLATION ......................6 CAUTION WITH THE ELECTRICAL INSTALLATION ..............7 CAUTION WITH THE GATE BEFORE THE AUTOMATION ............8 INSTALLING AND FIXING THE OPERATOR ................9 INSTALLING THE ANALOG LIMIT SWITCH ................14 MAINTENANCE ..........................16...
The installer must be a PPA specialized ins- DZ HUB R 350 DZ HUB R 550 DZ HUB R 450 DZ HUB R 600 taller to install DZ HUB R. Follow all the in-s- JETFLEX JETFLEX TYPE OF OPERATOR Sliding...
TOOLS REQUIRED FOR INTALLATION CAUTION WITH THE ELECTRICAL INSTALLATION Below are some of the tools required to install the operator: All electrical conductors must be installed on the operator correctly to avoid dama- ging the wiring. The wiring must run through conduits and internally through the floor base to en-sure no wiring conductor is trapped or damaged.
CAUTION WITH THE GATE BEFORE THE step: Check if the gate leaf does not get stuck in the opening and clos-ing mo- vements. The gate’s sliding rail must be perfectly straight, leveled, and periodically AUTOMATION cleared of any element or dirt that makes it difficult for the pulleys to slide along its entire length, as shown in the figure below.
Page 6
step: The base dimensions must be appropriate for the operator dimen-sions. step: Pre-align the operator to the gate, position the rack over the gear, and The concrete base must be approximately 20 mm from the face of the gate leaf. place the assembly against the gate.
Page 7
6th step: With the operator unlocked, position the rack over the gear and align it step: Provide shims to ensure rack alignment if the gate leaf is warped. There with the gate. are cases where the rack must exceed the length of the sheet. In this case, provide Leave approximately 2 mm clearance between the rack tooth’s top and the gear an angle bracket, so it does not skip the teeth when starting the operator.
INSTALLING THE ANALOG LIMIT SWITCH step: Start the motor and check if the REEDs are shutting down cor-rectly. If necessary, reverse the board connector. Once the magnet brackets are fixed, make the final adjustments, moving them to step: With the gate closed, place the magnet support on the rack, positioned in the right or left, down or up, according to the desired adjustment.
Page 9
After that, refer to the control board Voltage: Board: manual available for download at Size: Assembly: www.ppa.com.br and make all con- Fairing: nections and configurations. Gear: MAINTENANCE The table below lists some PROBLEMS — DEFECTS, PROBABLE CAUSES, AND CORRECTIONS — that may occur in your operator. Before any maintenance, turn off the electrical power supply.
Need help?
Do you have a question about the DZ HUB R and is the answer not in the manual?
Questions and answers