S9106Ac-4Up: Detailed Steps To Verify Operation; Connect Ac Power Cords & Power On Equipment; Verify X-Apps Controls S9106Ac-4Up Rf Ports At 3 Ghz On Page; Connect Ac Power Cords & Power On Equipment On Page - Keysight Technologies S9106AC-42D Startup Manual

5g fr1 multi-port transceiver solutions
Table of Contents

Advertisement

6 Verify Operation

6. 2 S9106AC-4UP: Detailed Steps to Verify Operation

1.
Connect AC Power Cords & Power On Equipment on page 62
2.
Verify X-Apps Controls S9106AC-4UP RF Ports at 3 GHz on page 63
6. 2. 1 Connect AC Power Cords & Power On Equipment
3. Connect an AC Power Cord to the S9106AC Base System right-rear panel.
4. Power on the S9106AC-4UP AC Power Switch, located on the left-front panel.
The M9037A PXIe Embedded Controller and the M9300A PXIe Reference are
part of the S9106AC Base System; they both power on and initialize
automatically when the S9106AC Base System is powered on.
62
After connecting AC power cords and powering on equipment, the
following process must be repeated for each M9410A PXIe VXT
Vector Transceiver and its selected X-Apps software pair in the
system; the S9106AC-4UP 5G FR1 Multi-port Transceiver
contains four M9410A PXIe VXTs that are labelled on the
Rugged Front Panel as Transceiver 1, Transceiver 2,
Transceiver 3, and Transceiver 4.
S9106AC-2IF, -4UP, and -42D 5G FR1 Multi-port Transceiver Solutions, Startup Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

S9106ac-4upS9106ac-2if

Table of Contents