6 Verify Operation

S9106AC-2IF
To verify operation of the S9106AC-2IF 5G FR1 Multi-port Transceiver
1.
2.
3.
S9106AC-4UP
To verify operation of the S9106AC-4UP 5G FR1 Multi-port Transceiver
1.
Connect AC Power Cords & Power On Equipment on page 62
2.
S9106AC-42D
To verify operation of the S9106AC-42D 5G FR1 Multi-port Transceiver
1.
2.
3.
S9106AC-2IF, -4UP, and -42D 5G FR1 Multi-port Transceiver Solutions, Startup Guide
All of the previous sections must be completed before
verifying operation of the S9106AC-2IF, S9106AC-4UP,
or the S9106AC-42D.
Each module has its own instance of X-Apps, so the S9106AC-2IF
system will have two instances of X-Apps running while the
S9106AC-4UP and S9106AC-42D systems will have four
instances of X-Apps running.
You need to select the appropriate X-App window to control a
particular transceiver. Each X-App instance shows the slot
number of the VXT2 module it is controlling in the title bar of the
window; they are in sequential order, so: Transceiver 1 is the
lowest numbered slot, Transceiver 2 is the next numbered slot.
On S9106AC-4UP and S9106AC-42D systems, Transceiver 3 is
the next numbered slot, and Transceiver 4 is the final numbered
slot.
6 Verify Operation